Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpforms-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/highall.co.uk/httpdocs/highall-staging-/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-smushit domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/highall.co.uk/httpdocs/highall-staging-/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/highall.co.uk/httpdocs/highall-staging-/wp-includes/functions.php on line 6114
Wood Street – Highall Developments

Wood Street

40 mixed dwellings in a rural setting at Great Harwood, Blackburn

Our Great Harwood site boasts 40 quality-built homes which comprises of a mixture of 40 mix units of semi detaches houses and bungalows, comprising of 2 Bed Bungalows, 2 Bed Semi-detached properties and 2 bed Tripple terraces.

Each house has a parking area and landscaped back garden with patio area. The homes are finished the highest quality finish and built to last.

Key Details:

wood street 2024 2

Sensitive and complex site

Our partners contacted Highall with a highly sensitive and complex build site. They needed a developer that they could work with and trust to meet the tight deadlines required with this build.

full size elevation southport road